Use a Plumb bob (Sahul) to level the position of GI Stud, Wooden Frame where you will place your panels.

Step 1

Level The Positions

Use a Plumb bob (Sahul) to level the position of GI Stud, Wooden Frame where you will place your panels. After that place another GI stud with centre of distance 600 mm.

Using the drill screw your GI studs, Wooden Frame into place. Keep screw spaced atleast 10 inches apart.

Step 2

Install GI Stud

Using the drill screw your GI studs, Wooden Frame into place. Keep screw spaced atleast 10 inches apart.

Repeat steps 1 and 2 for framing your GI, Wooden wall studs.

Step 3

Building GI grid

Repeat steps 1 and 2 for framing your GI, Wooden wall studs.

After framing GI, Wooden wall studs,Carefully place the Abord Wool through adhesive for bonding.

Step 4

Adhesive for bonding of Absorb Wool

After framing GI, Wooden wall studs,Carefully place the Abord Wool through adhesive for bonding.

After the bonding of absorb wool, place your acoustical Panel above the absorb wool through screws

 Step 5

Placing Acoustical Panel

After the bonding of absorb wool, place your acoustical Panel above the absorb wool through screws              

Place the Ceiling Panels

Step 6

Place the Ceiling Panels

Drop the ceiling panels into position by tilting them slightly, lifting them above the framework and letting them fall into place